Building reusable rockets to empower science, exploration, and innovation beyond our planet.

With all 13 Aeon R engines installed on the thrust structure and stage two heading towards hot fire, August was a big month for Terran R. 🔩 Build: All 13 Aeon R engines were installed onto the thrust structure. Stage one integration is advancing and both interstage barrels were stacked. Flight two barrels are complete and flight three production has begun. 🧪 Test: Stage two completed cryoproof and COPV proof testing and is now being readied for Aeon V engine installation ahead of hot fire. 🏗️ Launch: Flame diverter installation is underway at the pad, the engineering support building opened, and HIF outfitting continues.
17
109
700
83,897
LC-16 is taking shape. ✔️ Flame diverter installation is underway, built to redirect the immense heat, exhaust, and acoustic energy generated at launch. ✔️ Launch table steel is going up alongside continued work on the LNG tank farm and lightning protection system, raising the first sections of the 531-foot towers. ✔️ Inside the HIF, outfitting continues as the transporter erector upper strongback takes shape. ✔️ The engineering support building is officially open, giving the teams who will operate Terran R launch campaigns a new home on-site.
8
40
374
20,349
Hardware across the vehicle continues to advance through test. 📍 Long Beach, CA The first stage downcomer completed its full acceptance test campaign. This flight-critical component, which routes liquid oxygen from the tank to the engines, is now cleared for integration. 📍 NASA Stennis, MS Stage 2 is back in the hangar after completing cryoproof and COPV proof testing. Post-test inspections are underway ahead of Aeon V installation. A2 is being prepped for hot fire, with LOX farm flushes and heat exchanger activations. On the R stand, acceptance testing of flight 2 Aeon R engines is underway.
4
21
192
11,809
Terran R hardware is advancing across multiple fronts, with integration work progressing on stage one and production scaling for future vehicles. ✓ All 13 flight one Aeon R sea-level engines installed onto the thrust structure ✓ All nominal joiners and external stringers approaching completion on stage one ✓ Both interstage barrels were painted and stacked to form the full structure ✓ All flight two barrels complete, first circumferential friction stir welds executed on the flight two stage one tank ✓ Flight three panel fabrication more than halfway complete
6
47
327
30,504
With all 13 Aeon R engines installed on the thrust structure and stage two heading towards hot fire, August was a big month for Terran R. 🔩 Build: All 13 Aeon R engines were installed onto the thrust structure. Stage one integration is advancing and both interstage barrels were stacked. Flight two barrels are complete and flight three production has begun. 🧪 Test: Stage two completed cryoproof and COPV proof testing and is now being readied for Aeon V engine installation ahead of hot fire. 🏗️ Launch: Flame diverter installation is underway at the pad, the engineering support building opened, and HIF outfitting continues.
17
109
700
83,897
💫 Terran R has been selected for NASA’s Launch Services (NLS) II contract, making us eligible to compete to launch future @NASA science, planetary, and exploration missions. We’re excited to help unlock new frontiers of discovery beyond Earth. Learn more: nasa.gov/news-release/nasa-a…
19
116
682
55,724
The infrastructure required to launch a rocket of Terran R’s class is immense. At LC-16, we’re moving fast. ✓ Horizontal integration facility (HIF) is energized. This building will house Terran R's stages to be mated and prepared for launch ✓ 135 ton assembly room cranes completed their first proof load tests. These cranes will lift the vehicle for mate ✓ Transporter erector (TE) upper strongback was moved into the assembly room. This is part of the system that will transport Terran R to the pad and raise it vertical ✓ Permanent site power was activated with two dedicated 22-kilovolt feeds. This powers launch operations across the site
7
30
340
21,404
Test campaigns are building momentum, with major milestones logged across sites in July. 📍 Long Beach, CA ✔️ Stage one structural qualification campaign complete ✔️ 420 pressure cycles, 62 loading cases, and 4.3 million lbf axial compression ✔️ Stage one downcomer for flight completed first phase of acceptance testing
3
19
253
10,963
📍 NASA Stennis, MS ✔️ Second stage lifted and mated onto the A2 stage test stand ✔️ Cryoproof and COPV proof testing complete ✔️ Aeon V engine completed acceptance testing, wrapping up all flight one engine testing
2
4
61
3,756
Terran R hardware is advancing across multiple fronts, with integration work progressing on the stage one flight article and momentum building for the next vehicle. Key highlights from July: ✓ Fully released the stage one shipping assembly, comprised of more than 11,000 parts ✓ First wet installs of external stringers completed on the interstage forward barrel ✓ Outer engine feedlines installed, fluids testing underway on the thrust structure ✓ Flight one Aeon R engines prepared for thrust structure installation ✓ First circumferential friction stir welds completed for a flight two tank
5
38
388
16,466
Throughout July, Terran R continued advancing toward first flight, with the stage one structural qualification campaign complete and stage two testing kicking off at NASA Stennis. 🔩 Build: The stage one shipping assembly was fully released, with work across the stage one flight article progressing alongside flight two tank production and welding. 🧪 Test: Completed the stage one structural qualification campaign in Long Beach. Over at NASA Stennis, stage two completed cryoproof and COPV proof testing. 🏗️ Launch: At LC-16, the HIF was energized, the assembly room crane passed its first proof load test, and the transporter erector upper strongback was moved into the assembly room.
17
79
531
79,188
Engine integration has begun! The first Aeon R engines are now installed on Terran R’s thrust structure. 💪 The thrust structure will house 13 Aeon R engines, each producing 269,000 lbf of sea level thrust for a combined thrust of 3,497,000 lbf at liftoff. 🔥 Each engine has successfully completed acceptance testing before installation on the vehicle. 🌀 Custom ground equipment precisely positions each engine for installation, then will rotate the fully integrated thrust structure into position for mate with stage 1. One step closer to a fully integrated stage 1!
28
165
1,198
125,275
Stage 2 testing is officially underway at NASA Stennis 🚀 The campaign kicked off with successful cryoproof, loading the stage with cryogenic fluids and pressurizing it beyond expected flight loads to validate its structural integrity, followed by COPV manifold proof testing to verify the high-pressure system that will pressurize propellants during flight. These tests also marked the activation of A2, bringing together the infrastructure, flight hardware, ground and vehicle software, and the integrated team of test, launch, and vehicle engineers. Next up: hot fire capable assembly work, then back to the stand ahead of stage hot fire testing. 🔥
14
102
778
59,630